PDM expands its metal fabrication services with a new Des Moines facility.
Timeline Stories
All timeline stories.
PDM moves (again) into a new office on the first floor of the same building in Des Moines’ Market District.
New batch plant with indoor temperature and moisture controlled aggregates and 2×3-yard mixers begins production .
Installation of a new 14-foot-wide seamless wall panel bed is complete, which allows for PDM to produce wider pieces with no pocket seams.
PDM Metals gets a new home in Carlisle, Iowa, which allows for expanded structural and other steel fabrication.
A new multipurpose building replaces PDM’s temporary trailers with a fully airconditioned locker room, restrooms and breakroom.
PDM’s first day of precast production as a PCI Certified producer with MNL 116 C3A and MNL 117 A1 certifications.